Aboveground Storage Tank (AST) Installations

In response to the increasingly stringency of regulations governing the use and maintenance of USTs, many clients (especially public agencies) have elected to replace their USTs with ASTs. Typically, the scope of work will include removing the existing UST system, design of an appropriate AST system, construction of the AST containment structure, installation of leak detection AST monitoring equipment, and selection of an appropriate fuel dispenser. Many of these options are site and use specific. Our experience can ensure that the transition from UST to AST goes smoothly and that the correct equipment is selected to meet the facility needs.