Construction of 80,000 Gallon Groundwater Batching System, Chevron Terminal

WPI designed, built and operated an 80,000-gallon groundwater holding and transfer system at the Chevron Terminal in El Segundo, California. This system allowed vacuum trucks from various Chevron sources to unload and filter contaminated groundwater for batch transfer to the refinery wastewater treatment unit. The unloading station and water filtration unit was located within the terminal and the storage tanks were located within the refinery operating unit.