Portfolio - Fueling System Design & Engineering

WPI is often retained to provide over water fueling facility consulting, design and planning services as well as UST installation and UST demo/removal in tidal impacted marine environments.  Over water fuel conveyance requires special knowledge...
  WPI provides design-build services for emergency generator fuel oil supply systems for hospitals, commercial data centers and office buildings.  WPI engineering provides complete fuel system design and support, from concept, startup...
  WPI was retained to provide design-build services for the temporary abandonment and reinstallation of an underground parking structure fueling system.  Construction work as part of a downtown redevelopment plan required the majority of...
WPI was retained to upgrade the underground storage tanks, fuel oil piping and day tanks for the emergency water pump system at a large aerospace facility.  The scope of work involved custom engineering of seismic support stands, concrete...
As bio fuels have been added to the local fuel supply, modifications have become necessary to the fuel distribution terminals.  WPI provided engineering design services to modify the pump stands, piping, overflow system and underground tanks to...
WPI provided engineering design for JP-8 military fueling system consisting of a large aboveground storage tank, pump skid inside pump house, above and below fuel piping, controls and dispensing system.
A national fuel retailer had been challenged by the local regulators over detectable amounts of fuel constituents in the interstitial monitoring fluid in their fiberglass double wall underground storage tanks.  The engineering team at WPI was...
  WPI was contracted to develop conceptual site plans and provide design engineering services for the construction of a retail fueling system offering both conventional and E85, E100 and B05  biofuels.   To maximize ethanol...
WPI was retained to provide environmental consulting, design engineering, permitting and field construction services to excavate petroleum impacted soil and perform site restoration for pending redevelopment.  Due to the congested urban...
  WPI was contracted by a large urban school district to design and install a ground water pump at treat system at an elementary school.   The source of the contamination was a leaking underground fuel storage tank at the school...