Portfolio - Groundwater Monitoring

The Shell Tuller Avenue groundwater treatment system --designed, built and operated by WPI-- includes three air stripping towers, two chemical feed systems,  a regenerative thermal oxidizer (RTO), granular activated carbon (GAC) vessels, and...
At the peak of this program, WPI provided quarterly monitoring and sampling for over 1,000 wells at more than 200 locations.  All work in is performed in accordance with requirements of the California Regional Water Quality Control Boards,...
WPI provides technical services to gauge and sample twenty-six wells on a quarterly basis at the DeMenno Kerdoon Waste Recycling facility in Compton, California. DeMenno Kerdoon is the largest used oil, wastewater and antifreeze recycler in the...
WPI is presently sampling 55 wells screened in three water bearing zones ranging from 35 to 135 feet below ground surface. Groundwater has been monitored on an on-going basis by WPI since 2006. WPI performs the following tasks as part of the...
At the peak of this on-going program, WPI monitored and sampled over 2,000 wells per quarter at more than 400 locations. All groundwater monitoring work is performed in accordance with requirements of the California Regional Water Quality Control...
WPI currently provides technical groundwater monitoring services at 24 World Oil Company locations.  Approximately 400 wells are monitored and sampled each quarter.  All groundwater monitoring work is performed in accordance with...