Refinery, Bulk Storage, and Terminal Projects

WPI designed, built and operated an 80,000-gallon groundwater holding and transfer system at the Chevron Terminal in El Segundo, California. This system allowed vacuum trucks from various Chevron sources to unload and filter contaminated groundwater...
This groundwater pump and treat system was designed and constructed by WPI for a Bakersfield, CA Terminal and Refinery.  The purpose of this system was to recover MTBE and TBA impacted groundwater that was rapidly migrating off-site....
WPI was actively involved with remedial efforts at the former Carson, CA Bulk Oil Terminal for more than five years. Remedial measures designed and implemented by WPI include pilot testing for Multi-Phase Extraction (MPE), In-situ Chemical Oxidation...