From the Ground Up: How Wayne Perry, Inc. Delivers Safe and Seamless Fueling Facility Construction

Take a behind-the-scenes look at the precision, process, and safety measures driving Wayne Perry’s turnkey construction services.

In fueling facility construction, success starts below the surface. At Wayne Perry, Inc., we know that delivering safe, long-lasting infrastructure begins with deep technical know-how, seamless coordination, and an unwavering commitment to safety. A recent project offers a detailed look into that process, starting from the ground up.

Precision in Every Pour

Our process begins with comprehensive site grading and excavation, followed by precise concrete placement using pump trucks and boom mechanisms. This ensures material reaches exactly where it’s needed, no guesswork, no waste. To finish the slab, we deploy “whirlybirds” that bring the cream to the surface, producing a strong, smooth foundation.

We apply a continuous pour technique to avoid cold joints, reduce cracking risk, and promote uniform curing. It’s a method that speaks to our obsession with quality. Every surface is carefully designed to perform under pressure.

Anchored in Safety

When it comes to underground storage tank (UST) installations, our teams follow a meticulous protocol. We excavate and shore each pit to the highest safety standards, using “dead men” for anchoring the tanks in place. Before anyone enters the excavation, we review a detailed 5-page standard operating procedure to ensure every crew member is aligned on expectations and safe practices.

Harnesses, secure rigging, and redundant safety systems are not extras; they’re essentials. It’s part of why Wayne Perry is a trusted name for clients who need results without compromise.

Engineering Strength, Construction Precision

Our multidisciplinary teams combine construction execution with engineering foresight. From CAD design and permitting to equipment specification and site planning, we bring every aspect of the job in-house. This integration ensures each component, from the tank set to the final pour, is aligned with the project’s long-term performance goals.

At Wayne Perry, Inc., we don’t just build fueling infrastructure; we engineer certainty, safety, and strength into every phase. Our approach blends construction craftsmanship with engineering excellence, allowing us to deliver turnkey fueling facilities that stand the test of time.

Looking to bring your fueling project to life with safety and precision at every step? Contact Wayne Perry, Inc. to get started.

Related Articles

From the Ground Up: How Wayne Perry, Inc. Delivers Safe and Seamless Fueling Facility Construction
From the Ground Up: How Wayne Perry, Inc. Delivers Safe and Seamless Fueling Facility Construction
Fueling the Future: Tank Set Milestone at Winchester Marks Major Progress for New Fueling Facility
Fueling the Future: Tank Set Milestone at Winchester Marks Major Progress for New Fueling Facility
The People Behind the Build: Why Wayne Perry is Powered by People
The People Behind the Build: Why Wayne Perry is Powered by People
Built Right. From the Ground Up.
Built Right. From the Ground Up.
Green Building Standards: How to Achieve LEED Certification
Green Building Standards: How to Achieve LEED Certification
Fuel Spill Mitigation: Steps to Protect Your Station
Fuel Spill Mitigation: Safeguarding Your Business and the Environment